Templates / Lifting Operations Permit

Free templatePDF · DOCX

Lifting Operations Permit

Authorises crane and heavy lifting work under the lift plan: certificates checked, ground conditions and exclusion zone confirmed, and the lift team named and signed.

Download the template

The PDF is free once you have an account. The editable Word file is included too, so you can adapt and issue it under your own document control.

PDF free with an accountWORD editable, free with an account

Every template is a starting point, not a finished document. Replace the headings and fields with your own project detail before you issue it.

Lifting operations permit icon

Lifting operations permit.

Why you need it on the job

A lift plan on paper means nothing if the ground was never checked or the slings were never inspected. The permit is the moment somebody confirms the plan matches the conditions on the day and puts their name to it.

How it links to the standards

The equipment and controls this template asks you to record are governed by published standards that define what each item must withstand and how it is tested. These are the ones that apply most directly:

The full EN standards library covers every standard referenced across SafetyOrbit.

Related guidance

Filling the template in is easier when you know the reasoning behind each control. These notes cover the practical detail:

Related guidance

The technique notes behind this document, from Lifting Operations & Rigging:

← Back to all templates

Frequently asked questions

Who authorises the permit?

The appointed person responsible for the lifting operation, working from the lift plan and their own check of the site on the day.

What stops a lift once it is authorised?

Wind above the stated limit, a change in ground conditions, an unplanned person entering the exclusion zone, or any accessory found to be damaged or out of certification.