Templates / Excavation Inspection Register

Free templatePDF · DOCX

Excavation Inspection Register

Start-of-shift and after-rain inspections of excavations by a competent person, with the weekly written report log.

Download the template

The PDF is free once you have an account. The editable Word file is included too, so you can adapt and issue it under your own document control.

PDF free with an accountWORD editable, free with an account

Every template is a starting point, not a finished document. Replace the headings and fields with your own project detail before you issue it.

Excavation inspection register icon

Excavation inspection register.

Why you need it on the job

Trench sides fail without warning, and the risk changes overnight with rain, frost, vibration and stored spoil. Recording an inspection at the start of every shift and after every significant weather event is what turns that into a controlled risk rather than luck.

How it links to the standards

The equipment and controls this template asks you to record are governed by published standards that define what each item must withstand and how it is tested. These are the ones that apply most directly:

The full EN standards library covers every standard referenced across SafetyOrbit.

Related guidance

Filling the template in is easier when you know the reasoning behind each control. These notes cover the practical detail:

Related guidance

The technique notes behind this document, from Construction & Demolition:

← Back to all templates

Frequently asked questions

Who is allowed to carry out the inspection?

A competent person with the knowledge and experience to recognise the ways an excavation can fail and the authority to stop work.

When does an inspection have to be repeated?

At the start of every shift, after any event likely to have affected the sides such as heavy rain or a fall of material, and on the written weekly cycle.

← All templates