Templates / Roofing RAMS
Roofing RAMS
Pre-populated with the roofing trade’s real hazards: falls, fragile surfaces, falling materials, weather limits, torch-on fire controls and asbestos checks, all pre-scored with controls.
Download the template
The PDF is free once you have an account. The editable Word file is included too, so you can adapt and issue it under your own document control.
Every template is a starting point, not a finished document. Replace the headings and fields with your own project detail before you issue it.

Roofing RAMS.
Why you need it on the job
Writing a roofing RAMS from a blank page for every job burns hours and still leaves gaps. Starting from a document that already carries the trade’s hazards and their scoring means you only add the site-specific detail before it goes to the principal contractor.
How it links to the standards
The equipment and controls this template asks you to record are governed by published standards that define what each item must withstand and how it is tested. These are the ones that apply most directly:
- EN 361 — full body harnesses
- EN 795 — anchor devices
- EN 360 — retractable fall arresters
- EN 397 — industrial safety helmets
The full EN standards library covers every standard referenced across SafetyOrbit.
Related guidance
Filling the template in is easier when you know the reasoning behind each control. These notes cover the practical detail:
- Roofing and Work at Height — the full technique-note library for this kind of work
- Fall Restraint vs Fall Arrest for Roof Work: Choosing the Right System
- Weather Limits for Roof Work: Wind, Rain and Ice
- Working Near Fragile Roof Surfaces and Roof Lights
Frequently asked questions
How much editing does it need before I can issue it?
Add the site address, the access arrangements, the roof construction and anything the survey found. The hazard and control sections are already written.
Does it cover torch-on work?
Yes. Fire controls for torch-on roofing are included, along with the fire watch that has to continue after the torch is switched off.