Templates / HVAC / Air Conditioning RAMS
HVAC / Air Conditioning RAMS
Air conditioning work combines a hot flame, a pressurised system and plant that usually sits on a roof. Each of those needs its own control, and the document keeps them together so the brazing permit is not forgotten because the access took all morning.
Download the template
The PDF is free once you have an account. The editable Word file is included too, so you can adapt and issue it under your own document control.
Every template is a starting point, not a finished document. Replace the headings and fields with your own project detail before you issue it.

HVAC RAMS.
Refrigerant handling, brazing under permit, pressure testing with nitrogen and roof plant access.
Why you need it on the job
How it links to the standards
The equipment and controls this template asks you to record are governed by published standards that define what each item must withstand and how it is tested. These are the ones that apply most directly:
The full EN standards library covers every standard referenced across SafetyOrbit.
Related guidance
Filling the template in is easier when you know the reasoning behind each control. These notes cover the practical detail:
- Tips and Tricks — the full technique-note library for this kind of work
Frequently asked questions
Why is nitrogen used for pressure testing?
Nitrogen is inert and lets the system be tested safely without releasing refrigerant, but it displaces oxygen so ventilation matters in enclosed plant rooms.
Does brazing need a hot work permit?
Yes. It is an open flame, so it is treated as hot work with combustible clearance, extinguisher provision and a fire watch afterwards.