Templates / CDM Appointment Letters

Free templatePDF · DOCX

CDM Appointment Letters

Ready-to-sign letters formally appointing the Principal Designer and Principal Contractor, as the regulations require to be done in writing.

Download the template

The PDF is free once you have an account. The editable Word file is included too, so you can adapt and issue it under your own document control.

PDF free with an accountWORD editable, free with an account

Every template is a starting point, not a finished document. Replace the headings and fields with your own project detail before you issue it.

CDM appointment letters icon

CDM appointment letters.

Why you need it on the job

An appointment that was only ever discussed in a meeting does not exist as far as an inspector is concerned. These letters put the appointment, the date and the scope on paper so the duty holder chain is provable from day one.

How it links to the standards

Where this template names protective equipment or a control measure, the equipment itself is governed by a published standard that defines what it must withstand and how it is tested. The full EN standards library covers each one in plain language so you can confirm you are specifying the right level of protection.

Related guidance

Filling the template in is easier when you know the reasoning behind each control. These notes cover the practical detail:

  • Tips and Tricks — the full technique-note library for this kind of work

← Back to all templates

Frequently asked questions

Why does the appointment have to be in writing?

Because the duties transfer with it. Without a written appointment the client retains the duties by default.

When should the appointments be made?

As soon as it is known that more than one contractor will be involved, and before design or construction work starts.

← All templates